Wednesday, June 4, 2014

Good Intentions

I figured with my DD leaving Sunday to go back to school for a summer internship that I would be doing nothing but sewing this week, NOT.

I have quilted a customer quilt and a couple craft show table runners but have not sewing anything other than this one block.


I try to keep self made kits ready to take to sewing group days (which I have one or two this month, hard to keep track) plus I have an upcoming retreat also this month.  I cut and made this block and then cut enough for 5 more blocks so that I can make two table runners, one in reds and one in greens.  Be easy to make these blocks and chat at the same time which is essential for a retreat!

It has been one of those weeks of multiple errands, chores and book work to do.  Today is my day time guild meeting so maybe tomorrow I can stay home and sew all day.

Monday, June 2, 2014

Design Wall Monday - June 2, 2014

Well I actually have nothing on my design wall and the design wall is even put away so that the wall it usually rests on can be painted.  Of course the painting was suppose to have been done a week ago but life happens.

I did work on getting borders on this cute kids panel last week and now have it ready to be quilted.   I believe this panel is called Jungle Bunch and it is by Timeless Treasures.


I also quilted several small customer items and worked for a few hours on the horse Warm Wishes lap quilt.

My DD was home from college for a few days before going back to start a summer internship so I tried to limit my sewing time to times she was out with friends and spend as much time with her as possible.

This will be the first summer she won't be home for the whole summer and old mom is having a little bit of a hard time dealing with that.  I know she would be bored crazy if she was here.  Her summer internship will also give her some spending money and some job experience in her field (Environmental Science) so she will be where she needs to be and hopefully enjoy it and learn a lot but change is hard.  At least she will be home for a few weeks the end of summer before starting back to school.

This week I hope to:
1.  Quilt two craft show table runners
2.  Quilt customer planet quilt
3.  Cut out more table runners for retreat later in the month
4.  Work on horse quilt



Sunday, June 1, 2014

Sunday Stash Report - June 1, 2014

Though we have had some summer weather already I am having a hard time believing that it is already June.   I have both a trip to Lancaster county PA with my hubby and also a 3 day quilting retreat to look forward to this month so I think June is going to be great.

I have very little yardage I can claim for my stash report this week.  DD has been home from college for 10 days so have been enjoying my time with her.  She leaves to go back today so I am sure I will be spending a lot of my time in the sewing room the next few days with no one to visit with.

A patriotic table runner was pieced this week and also added borders to a cute kids panel to make a nice baby quilt.  I purchased 1/2 yard each of two different greens that I think will make good trees for some upcoming projects.  So my current stats are:

Fabric purchased this week:  1 yard
Fabric used this week:  3 yards

Fabric purchased YTD:  58.50
Fabric used YTD:  150.25

Net fabric used in 2014:  91.75

Monday, May 26, 2014

Design Wall Monday - Memorial Day 2014

A great Memorial Day to wall who served or are currently serving.  Since I live in a military town just about everyone has some connection to the military.  

My design wall actually has something on it.  I went to an all day sew in and did major sewing and saved the cutting and ironing till I got home as the cutting/ironing table was really short and crowded and my back just couldn't handle it.  

I cut the strip sets into blocks yesterday for a Warm Wishes quilt using horse fabric.  Glad I have the barbed wire fabric, I think it added a lot to this.  

Last night I cut out the remainder of the blocks so think I will now neatly stack them up and save sewing them for my next sewing group.  

I have a 3 1/2 day retreat coming up in June so I need to start cutting out projects for that.  I have one quilt cut and ready to go but I don't know about you but when I go to a retreat I need 3 or 4 things to work on so I can rotate if I get tired of sewing on one project.


Sunday, May 25, 2014

Sunday Stash Report - May 25, 2014

Not as much yardage used this week as I had hoped because I spent a lot of my sewing time quilting a couple customer items.  I did mange to quilt up some table runners so I was able to claim the backing and also made a patriotic wall hanging just waiting for the binding to get done.    This is Northcott's new Stonehenge panel just recently available (I got my bolt about 2 weeks ago).



I also spent all day yesterday at a sew in.  Worked on three projects but finished nothing so that yardage will be claimed in coming weeks.  

Current stats are:

Fabric purchased this week:  2.75 yards (patriotic panel and 2 yards Christmas red)
Fabric used this week:  8 yards

Fabric purchased YTD:  57.50 yards
Fabric used YTD:  147.25 yards

Net used in 2014:  89.75 yards  (not as much as I had hoped so far but churning along)


Thursday, May 22, 2014

Patriotic

With Memorial Day coming up I figured I would take one of the new Stonehenge panels I got in,  add a couple of borders and get it quilted.  Won't be ready to put in my foyer by Memorial Day but should be up well before the 4th of July.  Will make a nice hanging for my foyer maybe through Labor Day.

My goal is to have a different wall hanging to put up for each season.




Monday, May 19, 2014

Design Wall Monday - May 19, 2014

There is actually NOTHING currently on my design wall.  I finished the table runner tops I was working on so those are put away waiting on quilting.  I have a couple of project cut out but didn't want to show just strips of fabric so I will show you my most recently finished project.  

I took a class about three years ago and made this quilt top.  I finally quilted it a couple of weeks ago and my friend Jane just finished sewing down the binding for me.  I love this one and think it will have to be a keeper.  I think it will fit on a wall in my bedroom so will have to measure and get a hanging sleeve on it before another 3 years go by!

I did quilt two table runners yesterday and loaded a small customer quilt on the frame so I have been spending time every day in the sewing room.  

This week I hope to:
1.  Get two customer quilts quilted (both really small)
2.  Quilt two more runners
3.  Work on Patriotic wall hanging
4.  Start sewing on Warm Wishes horse quilt

DD gets home from college wednesday evening so I don't know how much sewing I will get done for a couple of days but I am sure she will be visiting friends and doing shopping for clothes for her summer internship so am sure I will still have lots of time in the sewing room.